Philip_BlueFX
Active member
Studying the G9 schematic and jumping around in the threads, a question sprouted inside my helpless mind.
Our power needs are 12V...Heaters, 245V...HT, 48V...phantom.
What's there to stop me from getting a custom toroid transformer and regulating-filtering each step for my power needs?
Instead of getting a 220:15+15 and 15+15:220, voltage trippler for phantom etc.?
My understanding is that the PSU was originally designed for the 220:15+15 that, I suppose, where heavily available at the Gyraf factory.
So, what's the underside of getting a multiwinding toroid in a case like this?
Our power needs are 12V...Heaters, 245V...HT, 48V...phantom.
What's there to stop me from getting a custom toroid transformer and regulating-filtering each step for my power needs?
Instead of getting a 220:15+15 and 15+15:220, voltage trippler for phantom etc.?
My understanding is that the PSU was originally designed for the 220:15+15 that, I suppose, where heavily available at the Gyraf factory.
So, what's the underside of getting a multiwinding toroid in a case like this?