Question for those of you who have built this:
I finished my build, went through all of the calibration steps without issue, and now have a great sounding compressor that works as it should. HOWEVER, I was not able to adjust the meter in the first step, and the reason is confusing me a little.
I don't think my meter has the screw that is supposed to be used to make this adjustment. I have looked and looked and for the life of me I can't figure out what I'm missing! The meter sits close enough to the -20 mark (left/white side) that it is perfectly usable as is, but it's blowing my mind that I can't find the screw to make this adjustment. Am I just reading the guide wrong??? Attaching a picture of the access port where the screw should be for reference...anyone want to tell me what super obvious thing I'm overlooking? I feel like an idiot.
View attachment 84730