I didn't look at your schemo, but in the schemo I referenced "rise time" is controlled by R6 (the rise time on the clip hold section has no control and is as fast as possible), fall time is r7 and r8 for the main meter and clip hold section respectively. Changing the cap effects both rise and fall times.