ruffrecords
Well-known member
Finally got my new workshop built. Although I ordered it mid Feb, the Log Cabin kit that will become my new workshop only arrived a week ago. The build team was supposed to erect it last Friday but their van broke down and anyway the rain was pouring down. They turned up today (Sunday) and fortunately it was a sunny day.
Here is the concrete pad it sits on:
https://drive.google.com/open?id=0B_n67A1hN3qtaUlrTmtJLTQ0Tnc
The floor:
https://drive.google.com/open?id=0B_n67A1hN3qtMGFTRWEzYXE2VTQ
The start of the walls:
https://drive.google.com/open?id=0B_n67A1hN3qtZ3VEZE1zdk1ZME0
Walls finished:
https://drive.google.com/open?id=0B_n67A1hN3qtOE04UTBCZUZCRDg
Starting the roof:
https://drive.google.com/open?id=0B_n67A1hN3qtSENpZEVOT2w4d1E
And the floor:
https://drive.google.com/open?id=0B_n67A1hN3qtVmNjcmhzOUtVVTg
Roof and floor nearly done:
https://drive.google.com/open?id=0B_n67A1hN3qteHRBZ3ZaMjRlQ0k
and finally finished:
https://drive.google.com/open?id=0B_n67A1hN3qtU2g0dS1vVVk3U0U
The only gremlins were some damage to the window frame but that is easily repaired and they were short six roof tiles which are on order.
I am one happy bunny.
Cheers
Ian
Here is the concrete pad it sits on:
https://drive.google.com/open?id=0B_n67A1hN3qtaUlrTmtJLTQ0Tnc
The floor:
https://drive.google.com/open?id=0B_n67A1hN3qtMGFTRWEzYXE2VTQ
The start of the walls:
https://drive.google.com/open?id=0B_n67A1hN3qtZ3VEZE1zdk1ZME0
Walls finished:
https://drive.google.com/open?id=0B_n67A1hN3qtOE04UTBCZUZCRDg
Starting the roof:
https://drive.google.com/open?id=0B_n67A1hN3qtSENpZEVOT2w4d1E
And the floor:
https://drive.google.com/open?id=0B_n67A1hN3qtVmNjcmhzOUtVVTg
Roof and floor nearly done:
https://drive.google.com/open?id=0B_n67A1hN3qteHRBZ3ZaMjRlQ0k
and finally finished:
https://drive.google.com/open?id=0B_n67A1hN3qtU2g0dS1vVVk3U0U
The only gremlins were some damage to the window frame but that is easily repaired and they were short six roof tiles which are on order.
I am one happy bunny.
Cheers
Ian