Hi!
A friend asked me if I could rack a pair of Harrison32C, and another pair of Trident 80B console channel strips.. (I don't know the fabrication year).
I didn't have see the channels already, but the idea is to rack each Preamp/EQ, pair in a 2U 19" rack box. 360mm deep.
How difficult/challenging can be racking? I mean... average time to rack properly each pair?
I know I will have to cut the boards in the right place...
Also I will have to build a psu.. I know, nothing is easy, but want to have an approximate idea of what I will have to face.
Thank you for your advise!
Jay x
A friend asked me if I could rack a pair of Harrison32C, and another pair of Trident 80B console channel strips.. (I don't know the fabrication year).
I didn't have see the channels already, but the idea is to rack each Preamp/EQ, pair in a 2U 19" rack box. 360mm deep.
How difficult/challenging can be racking? I mean... average time to rack properly each pair?
I know I will have to cut the boards in the right place...
Also I will have to build a psu.. I know, nothing is easy, but want to have an approximate idea of what I will have to face.
Thank you for your advise!
Jay x