Good idea! One can fry oneself if not careful.
In the meantime, I’m getting glow on my heaters, but think I must have wired the 3-position switch incorrectly.
The meter gets pinned with nothing going in.
The switch is doing the wrong things - so i need to go back to the schematic and rewire it properly.
But the pinned meter and huge hum have me worried.
Noooooooo!
EDIT: I have ordered another switch (a 3P2T non-shorting) to replace the one I was using (3P3T shorting).
Waiting for it to arrive, but also noting that I did not ground the front panel at all.
I'm at least going to have to grind down the paint on the inside for each pot and switch, and put star washers in there, correct? Then tie those points somehow back to my main ground near the IEC?
Argh - this hum is driving me nuts. I thought I had a good layout going, 90 degree crossings, tight windings, not going around the sockets. Some ground is looping somewhere.
Does anyone have a pre-flight checklist for these units?
I'm not putting in the T4 until the buzz goes away, but I'm wondering if anyone has a standard checklist they go through - to help my troubleshooting.
Thanks in advance for any wisdom, folks!
![Frown :( :(](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)